WV - DHHR - BPH - OEHS - Public Health Sanitation

DHHR Site Search - DHHR Site Map

West Virginia Public Health Sanitation Division
  West Virginia Public Health Sanitation logo

Major Programs


Body Piercing

Bottled Water

Disaster Information

Food Sanitation

General Sanitation

Individual Water Supply

Infectious Medical Waste

Milk

Other Programs

Recreational Water Facilities

Sewage

Training


Other Items


Environmental Health Procedures Manual

Forms & Applications

In-Service Meetings

Legislative Rules

Liaison Committee Minutes

Links

Search Site

State Board of Sanitarians

West Virginia Association of Sanitarians

What does a Sanitarian do?


West Virginia Department of Health & Human Resources logo

 

Environmental Health Procedures Manual

 

Waste Water

 

Procedure Number
Subject
Date
WW-1 Septic Tank Permit Moratorium 12/11/80
WW-2 REPEALED:  Notification Of Extension Of Septic Tank Installers Certification Expiring
See 64 CSR 09:  Sewage Systems Regulations
10/11/06
WW-3 Privy Plans - Department Of Highways 03/18/81
WW-4 Sewage Holding Tanks 03/28/89
WW-5 Attorney General's Opinion - Inspection of Small Sewage Treatment Systems 04/15/83
WW-6 Inspection of a Standard Septic Tank System Installation 06/02/08
WW-7 Approval and Application Procedures for Individual Sewage Systems with Surface Discharge of <600 Gallons Per Day 11/14/01
WW-8 Sewage Program - Division of Responsibility 05/25/11
WW-9 Garbage Grinders 05/17/88
WW-10 Guidelines for Approval of Subdivisions Served by Individual On-Site Sewage Disposal Systems 09/24/90
WW-11 Reuse of Package Sewage Treatment Plants 08/05/87
WW-12 Permits to Construct Sewer Line Extensions 01/23/07
WW-13 Grease Traps 05/17/88
WW-14 Sewage Tank Cleaning Firms 02/22/07
WW-15 Design Criteria:  Subsurface Stone Filter for Treatment of Mine Bath House Wastewater 07/20/98
WW-16 Interim Design Criteria for Constructed Wetlands for Sewage Disposal Treatment 05/31/00
WW-17 REPEALED: Splitting Reserve Area in Subdivisions for On-Site Disposal Systems
See 64 CSR 09: Sewer Systems, Sewage Treatment Systems, and Sewage Tank Cleaners
12/06/07
WW-18 Subdivision Requirements 05/01/92
WW-19 REPEALED: Labor Camp Design Loading for Sewage Treatment Facilities
See 64 CSR 47: Sewage Treatment and Collection System Design Standards
12/06/07
WW-20 Installer Certification Requirement for HAU Installation 05/21/10
WW-21 Requirement for Property Owners Performing Percolation Testing 06/21/07
WW_22 Septic Tank Cleaning 12/10/12

 

Back to the Procedures Manual main page